feed.gg
← FeedPart ofLords of the Fallen 2 Delayed to Early 202710 articles · 10 sourcesView full story →
Push Square
pushsquare.com
Read at pushsquare.com ↗
newsPublished

Lords of the Fallen 2 Retreats from Insane Fall Release Schedule, Delayed into 2027 on PS5

Lords of the Fallen 2 has been delayed from its planned autumn 2024 release into the first quarter of 2027. Publisher CI Games stated the delay is to refine the game based on feedback from a dedicated Souls-like veteran team. This revised window also strategically positions the title outside of a competitive holiday period.

Push SquareArticle tone: Neutral
Image · Push Square
Original source

This article was reported and published by Push Square. feed.gg links to it as part of a story cluster — full text, images and rights remain with the publisher.

Open original ↗